| Profiles of Turkish Public Sector Projects for Foreign Funding in 2000 | Energy |
| KAYRAKTEPE DAM AND HEPP | 1985D020090 |
| Project Description | 290
MW
768 GWh |
| Executing Agency | Gen. Dir. of State Hydraulic Works (DSİ) |
| Location | İçel |
| Duration | 1985 - 2003 |
| Status | Kayraktepe
Dam and HEPP are located on Göksu River in the East Mediterranean Basin.
Site works have almost been completed and infrastructure for construction is ready. Characteristics and cost figures of the project were recently changed according to the revised design study, prepared by JICA, which aims at reducing land expropriation works and costs. Studies were started to revise the feasibility report. Full credit-based bidding is planned for the project. |
| (million US$) | ||
|
Foreign
|
TOTAL
|
|
| Project Cost | 360,0 | 450,0 |
| Accumulated Expenses as of End 1999 | 0,0 | 9,4 |
| 2000 Allocation | 0,0 | 0,1 |
| Required Loan Amount | 360,0 |