| Profiles of Turkish Public Sector Projects for Foreign Funding in 2000 | Air Transport |
| MİLAS-BODRUM AIRPORT NEW TERMINAL BUILDING |
| Project Description | Construction of International Lines Terminal Building |
| Executing Agency | Gen. Dir. Of State Airports Administration (DHMİ) |
| Location | Muğla-Milas |
| Duration | |
| Status | The capacity
of terminal building is planned to be 5 million passengers per
annum. Total area of terminal is 74.000 m2. In the range of the project, there are 750 car-capacity car-park area, 7 passenger bridges, 60 check-in counters, passport control counters and commercial volumes. International tender by BOT model has been opened on 21.11.1998 and proposals will be taken till 04.02.2000. The tender will be realized at the same day. |
| (million US$) | ||
|
Foreign
|
TOTAL
|
|
| Project Cost |
|
70,0
|
| Accumulated Expenses as of End 1999 |
0,0
|
0,0
|
| 2000 Allocation |
0,0
|
0,0
|
| Required Loan Amount |
0,0
|
|